![]() 10/23/2019 at 10:04 • Filed to: Worklopnik, asbestos | ![]() | ![]() |
Yesterday before we left the job site we managed to get the JLG stuck, or spinning tires in the mud. So we stopp d by the shop on the way home (left 2 hours early, 1hour drive to warehouse) loaded up a few 2x12 boards in various lengths. After a few attempts got it out and lined it up to remove more asbestos via glovebag method. As I’ve shared before. (Same plant).
From the last time I was here:
!!! UNKNOWN CONTENT TYPE !!!
![]() 10/23/2019 at 10:32 |
|
Successful operation doctor!
![]() 10/23/2019 at 11:39 |
|
Needs moar maxtrax
![]() 10/23/2019 at 12:05 |
|
Working all day out of a cherry picker is literally the worst. Your legs and calves hurt in ways that you didn’t previously know possible.